PLTW-Engineering Design & Dev - Huber - P3(A-E)
G2.0 Opportunities for Incremental Testing Plan
Skip To Content
Dashboard
  • Login
  • Dashboard
  • Calendar
  • Inbox
  • History
  • Help
Close
  • My Dashboard
  • PLTW-Engineering Design & Dev - Huber - P3(A-E)
  • Assignments
  • G2.0 Opportunities for Incremental Testing Plan
2021/2022 - Woodstock High School - Semester 2
  • Home
  • Files
  • Modules
  • StudyMate
  • BrainPOP
  • Mastery Tracker
  • Collaborations
  • IXL Learning
  • Co:Writer
  • Snap&Read
  • Word Bank
  • uPAR
  • DeltaMath
  • Lucid (Whiteboard)
  • Discovery Education - LTI 1.3

G2.0 Opportunities for Incremental Testing Plan

  • Due No Due Date
  • Points None
Deliverable
line.png
Gray_Resources.png

 

Introduction

Most products and systems have many components. If one component fails, the product will often not function as intended. Incremental testing of individual parts, subsystems, or subassemblies is often used when testing complex products. As an example, consider all of the sub-steps that most software completes as part of the overall function of the program. Because it is difficult to isolate and correct errors in large, complex programs, it is nearly impossible to create complex programs that work flawlessly without first testing the sub-steps. Testing sub-systems to make sure each works as expected before the system is assembled is one method of incremental testing. Another method is to continually layer functions in a program and test the growing partial program as the new functions are added. Both methods enable problems to be more easily isolated and corrected before the overall system is tested.

 

Equipment

  • Engineering notebook

 

Procedure

Your team will identify subsystems in your design and determine how each must perform to be considered successful. You must determine the extent to which each subsystem or element should be tested. Is there a simple pass/fail test? Is a certain degree of success needed? Should the subsystem be tested once or repeatedly? Complete all work in your engineering notebook.

  1. Separate your design into individual parts or subsystems that can be created and tested individually. List and describe these separate components.
  2. Describe how you can test each component. Determine how each component must perform in order for the overall design to be a success. Then describe in detail the test results that will distinguish acceptable performance for each test.

 

Conclusion

  1. Which subsystem or element of your design do you believe has the highest probability of causing your design to function incorrectly? How are you planning to avoid the issue(s)?
  2. Think of an existing product or system and describe one element of that system that could be enhanced to dramatically improve the overall system.
0
Please include a description
Additional Comments:
Rating max score to > pts
Please include a rating title

Rubric

 
 
 
 
 
 
 
     
Can't change a rubric once you've started using it.  
Find a Rubric
Find Rubric
Please include a title
Title
You've already rated students with this rubric. Any major changes could affect their assessment results.
Title
Criteria Ratings Pts
Edit criterion description Delete criterion row
This criterion is linked to a Learning Outcome Description of criterion
threshold: 5 pts
Edit rating Delete rating
5 to >0 pts
Full Marks
blank
Edit rating Delete rating
0 to >0 pts
No Marks
blank_2
This area will be used by the assessor to leave comments related to this criterion.
pts
  / 5 pts
--
Additional Comments
Total Points: 5 out of 5